Imang Reservoir Improvement Works
IMANG RESERVOIR IMPROVEMENTS Before dam embankment. A one metre high wave protection wall was constructed using gabions on top of the dam embankment. Pre-treatment (28.03.2019). 22.4.2022 Practical Completion Inspection. Imang catchment covers about 1,095 hectares of land in the Brunei-Muara district within Kg. Panchor Murai. The Imang Reservoir improvement project was a 15-month program. KPI […]
MASTERPLAN FOR A RICE PROCESSING CENTRE AT WASAN
MASTERPLAN FOR A RICE PROCESSING CENTRE AT WASAN The Rice Processing Centre (RPC) Masterplan was commissioned by the Department of Agriculture and Agrifood in September 2013. Following an overview environmental impact assessment, the schematic layout was refined into a Masterplan with major components identified for costing and staging of development. Site planning for the RPC […]
Sungai Tutong Downstream Flood Mitigation

Sungai tutong downstream flood mitigation Contract Signing Start-Up Meeting with contractor and client Road Raising at the Bridge Bundwall at Penapar Diversion 11/03/2023 Lubok Pulau Pump Station and Levee Water Sampling The objective of this scheme is to provide protection from a 1- in-100 year flood to the residents, commercial areas, schools and community facilities […]
Environmental Study of Manganese and other Mineral Contents along Tutong River

Environmental Study of Manganese and Other Mineral Contents along Tutong River KPI Sdn Bhd was commissioned by the Ministry of Development with the Department of Water Services as the representative to prepare an environmental study of Manganese and other mineral contents along Tutong River. There are several objectives of the work: Provide a response plan […]