kpibrunei

  • (673) 2444-844 I (673) 2420-532

Imang Reservoir Improvement Works

IMANG RESERVOIR IMPROVEMENTS Before dam embankment. A one metre high wave protection wall was constructed using gabions on top of the dam embankment. Pre-treatment (28.03.2019). 22.4.2022 Practical Completion Inspection. Imang catchment covers about 1,095 hectares of land in the Brunei-Muara district within Kg. Panchor Murai. The Imang Reservoir improvement project was a 15-month program.  KPI […]